{"meta":{"title":"North America RPS / CES Supply-Demand Model","vintage":"2025-2026","generated":"2026-06-19","years":[2024,2025,2026,2027,2028,2029,2030,2031,2032,2033,2034,2035,2036,2037,2038,2039,2040,2041,2042,2043,2044,2045],"anchor_years":[2024,2028,2032,2036,2040,2045],"jurisdiction_count":43,"review_note":"Full NCSL/primary-source cross-check completed 2026-06-19: all 43 jurisdictions verified. 16 corrected/refined this review (see `note` fields); the remainder confirmed against the NCSL state RPS table.","federal_context":"Federal backdrop (2026): state RPS/CES statutory targets are unchanged, but the federal incentives that historically supported compliance have shifted. The 2025 federal budget reconciliation law accelerated the phase-out of clean-energy production and investment tax credits (PTC/ITC), and federal offshore-wind permitting and approvals were curtailed - raising REC/compliance costs and pressuring offshore-wind-linked targets such as New Jersey's 11,000 MW. EIA notes RPS success depends in part on federal tax credits. (Sources: EIA; C2ES; 2025-26.)","regulatory_asof":"2026-06-26"},"sources":[{"name":"NCSL RPS State Policy Database","desc":"US state RPS targets, dates, eligibility","url":"ncsl.org/energy/renewable-portfolio-standards","vintage":"May 2026"},{"name":"DSIRE","desc":"State-by-state RPS rules, carve-outs, multipliers","url":"dsireusa.org","vintage":"May 2026"},{"name":"EIA AEO 2025","desc":"State/region electricity load forecast 2024-2045","url":"eia.gov/outlooks/aeo","vintage":"2025"},{"name":"NERC LTRA","desc":"Long-term reliability / supply build-out","url":"nerc.com","vintage":"2025"},{"name":"Nodal Exchange","desc":"US Class I/II REC forward curves","url":"nodalexchange.com","vintage":"Feb 2026"},{"name":"NRCan / CER","desc":"Canadian provincial energy outlook","url":"nrcan.gc.ca","vintage":"2025"},{"name":"SaskPower IRP 2023","desc":"Saskatchewan 50%-by-2030 pathway","url":"saskpower.com","vintage":"2023"},{"name":"NS UARB Clean Electricity Plan","desc":"Nova Scotia 80%-by-2030 filing","url":"nsuarb.ca","vintage":"2024"}],"jurisdictions":[{"country":"US","num":1,"state":"California","grid":"WECC","program":"SB 100 / SB 1020","target":"100% by 2045","target_year":2045,"base2024":"44%","oblig2026":"49%","tiers":"PCC1/PCC2/PCC3","techs":"Solar,Wind,Geo,Biomass,Small Hydro","acp":"$50","note":""},{"country":"US","num":2,"state":"New York","grid":"NPCC/NYISO","program":"CLCPA","target":"70% by 2030; 100% CES by 2040","target_year":2030,"base2024":"24%","oblig2026":"38%","tiers":"Tier 1/Tier 2/ZEC","techs":"Wind,Solar,Hydro,Tidal,Fuel Cell","acp":"$10-$20","note":"VERIFIED: ~24% renewable in 2024 (NY DPS biennial review); modeled trajectory toward 70%/2030, state tracking to ~2033"},{"country":"US","num":3,"state":"Illinois","grid":"MISO","program":"CEJA (2021)","target":"50% by 2040","target_year":2040,"base2024":"18%","oblig2026":"24%","tiers":"Renewable/Solar/Wind","techs":"Solar,Wind,Biomass,Geo,Small Hydro","acp":"$15","note":""},{"country":"US","num":4,"state":"Michigan","grid":"MISO","program":"PA 235 (2023)","target":"60% by 2035; 100% clean 2040","target_year":2035,"base2024":"14%","oblig2026":"20%","tiers":"Renewable/Nuclear/Clean","techs":"Solar,Wind,Nuclear,Storage+RE","acp":"$20","note":""},{"country":"US","num":5,"state":"Minnesota","grid":"MISO","program":"NextGen Energy Act (2023)","target":"80% carbon-free by 2030; 100% by 2040","target_year":2030,"base2024":"33%","oblig2026":"40%","tiers":"Renewable/Clean","techs":"Wind,Solar,Hydro,Storage","acp":"$50","note":"VERIFIED (NCSL): 55% RE by 2035 + 100% carbon-free 2040; 80% carbon-free 2030 is the interim"},{"country":"US","num":6,"state":"Colorado","grid":"WECC","program":"SB19-236 (2019)","target":"100% by 2050; 80% by 2030","target_year":2050,"base2024":"34%","oblig2026":"40%","tiers":"Renewable","techs":"Wind,Solar,Geo,Small Hydro,Biomass","acp":"$20","note":"CORRECTED: program was 'SB 236 (2021)' -> SB19-236 (2019)"},{"country":"US","num":7,"state":"Nevada","grid":"WECC","program":"SB 358 (2019)","target":"50% by 2030","target_year":2030,"base2024":"28%","oblig2026":"36%","tiers":"Class I/Class II","techs":"Solar,Wind,Geo,Biomass","acp":"$50","note":""},{"country":"US","num":8,"state":"New Mexico","grid":"WECC","program":"Energy Transition Act (2019)","target":"80% by 2040; 100% by 2045","target_year":2040,"base2024":"30%","oblig2026":"37%","tiers":"Renewable","techs":"Solar,Wind,Geo,Biomass,Small Hydro","acp":"$50","note":"CORRECTED: program was 'ECEA 2021' -> Energy Transition Act (2019)"},{"country":"US","num":9,"state":"Washington","grid":"WECC","program":"CETA (2019)","target":"100% GHG-neutral by 2030; 100% clean by 2045","target_year":2030,"base2024":"40%","oblig2026":"53%","tiers":"Eligible Renewable","techs":"Wind,Solar,Geo,Biomass,Small Hydro","acp":"$10","note":"CORRECTED: target was '80% by 2030' -> CETA is GHG-neutral 2030 / clean 2045"},{"country":"US","num":10,"state":"Oregon","grid":"WECC","program":"HB 2021 (2021)","target":"100% by 2040","target_year":2040,"base2024":"35%","oblig2026":"43%","tiers":"Renewable","techs":"Solar,Wind,Geo,Biomass,Small Hydro","acp":"$25","note":""},{"country":"US","num":11,"state":"Montana","grid":"WECC","program":"SB 123 (repealed 2021)","target":"15% by 2015 (RPS repealed 2021)","target_year":2015,"base2024":"20%","oblig2026":"20%","tiers":"Eligible Renewable","techs":"Wind,Solar,Small Hydro","acp":"$10","note":"VERIFIED (NCSL): RPS repealed 2021 via HB576; target had been met"},{"country":"US","num":12,"state":"Idaho","grid":"WECC","program":"Voluntary","target":"No mandated RPS","target_year":null,"base2024":"24%","oblig2026":"—","tiers":"None (voluntary)","techs":"Wind,Geo,Small Hydro","acp":"—","note":""},{"country":"US","num":13,"state":"Utah","grid":"WECC","program":"HB 203","target":"20% by 2025 (voluntary/met)","target_year":2025,"base2024":"16%","oblig2026":"20%","tiers":"Voluntary","techs":"Solar,Wind,Geo","acp":"—","note":""},{"country":"US","num":14,"state":"Arizona","grid":"WECC","program":"ACC Rulemaking","target":"15% by 2025 (ACC, met)","target_year":2025,"base2024":"13%","oblig2026":"15%","tiers":"Class I/Class II","techs":"Solar,Wind,Geo,Biomass","acp":"$50","note":""},{"country":"US","num":15,"state":"Massachusetts","grid":"NPCC/ISO-NE","program":"RPS / GWSA","target":"35% Class I by 2030 (+1%/yr after)","target_year":2030,"base2024":"22%","oblig2026":"26%","tiers":"Class I/II/III","techs":"Solar,Wind,Fuel Cell,Low Emission","acp":"$85-$110","note":"VERIFIED (NCSL): Class I 35% by 2030, +1%/yr thereafter (model had 40%)"},{"country":"US","num":16,"state":"Connecticut","grid":"NPCC/ISO-NE","program":"PA 18-50 (2018)","target":"40% by 2030","target_year":2030,"base2024":"18%","oblig2026":"22%","tiers":"Class I/Class II","techs":"Solar,Wind,Fuel Cell,Hydro","acp":"$55","note":"CORRECTED: program was 'PA 21-53' -> PA 18-50 (2018)"},{"country":"US","num":17,"state":"Rhode Island","grid":"NPCC/ISO-NE","program":"RES (2022)","target":"100% by 2033","target_year":2033,"base2024":"20%","oblig2026":"27%","tiers":"Class I","techs":"Wind,Solar,Fuel Cell,Small Hydro","acp":"$50","note":""},{"country":"US","num":18,"state":"Vermont","grid":"NPCC/ISO-NE","program":"RES / Act 179 (2024)","target":"100% by 2030 (GMP, VEC) / 2035 (others)","target_year":2030,"base2024":"35%","oblig2026":"63%","tiers":"Tier I/II/III","techs":"Wind,Solar,Biomass,Hydro","acp":"$25","note":"CORRECTED: was 'VRES 2015 / 75% by 2032' -> Act 179 (2024) 100% by 2030/2035; obl26 set to 63% (2025 Tier I floor)"},{"country":"US","num":19,"state":"Maine","grid":"NPCC/ISO-NE","program":"LD 1679 (2019)","target":"80% by 2030","target_year":2030,"base2024":"42%","oblig2026":"52%","tiers":"Class I/Class II","techs":"Wind,Solar,Tidal,Biomass","acp":"$50","note":""},{"country":"US","num":20,"state":"New Hampshire","grid":"NPCC/ISO-NE","program":"RSA 362-F","target":"25.2% by 2025","target_year":2025,"base2024":"20%","oblig2026":"25%","tiers":"Class I/II/III","techs":"Wind,Solar,Biomass,Small Hydro","acp":"$55","note":""},{"country":"US","num":21,"state":"Maryland","grid":"PJM","program":"RPS (2004)","target":"50% by 2030","target_year":2030,"base2024":"15%","oblig2026":"20%","tiers":"Tier 1/Tier 2","techs":"Solar,Wind,Biomass,Fuel Cell,Geothermal","acp":"$40","note":""},{"country":"US","num":22,"state":"New Jersey","grid":"PJM","program":"NJCEP / Solar Act 2021","target":"50% by 2030 (Class I); 11,000 MW OSW by 2040","target_year":2030,"base2024":"22%","oblig2026":"35%","tiers":"Class I/II/SREC","techs":"Solar(SREC),Offshore Wind,Fuel Cell","acp":"$50-$200 SREC","note":"CORRECTED: '35% offshore wind' was a mislabel (35% = current Class I); OSW goal is 11,000 MW by 2040; obl26 27%->35%"},{"country":"US","num":23,"state":"Delaware","grid":"PJM","program":"REPSA (2005, am. 2021)","target":"40% by 2035","target_year":2035,"base2024":"11%","oblig2026":"15%","tiers":"Tier 1/Tier 2","techs":"Solar,Wind,Fuel Cell,Biomass","acp":"$25","note":""},{"country":"US","num":24,"state":"Pennsylvania","grid":"PJM","program":"AEPS (2004)","target":"8% Tier I by 2021 (met; weak)","target_year":2021,"base2024":"8%","oblig2026":"8%","tiers":"Tier I/Tier II","techs":"Wind,Solar,Biomass,Small Hydro,Fuel Cell","acp":"$2-$5","note":""},{"country":"US","num":25,"state":"Ohio","grid":"PJM","program":"HB 6 (2019)","target":"8.5% by 2026 (sunsets after 2026)","target_year":2026,"base2024":"8%","oblig2026":"8.5%","tiers":"Renewable","techs":"Wind,Solar,Biomass","acp":"$10","note":"CORRECTED: was 'SB 310 / 12.5% by 2027' (pre-2019). HB 6 cut to 8.5% by 2026 then eliminates the RPS"},{"country":"US","num":26,"state":"Virginia","grid":"PJM/SERC","program":"VCEA (2020)","target":"100% by 2045 (IOUs)","target_year":2045,"base2024":"6%","oblig2026":"12%","tiers":"Renewable","techs":"Solar,Wind,Offshore Wind","acp":"$30","note":""},{"country":"US","num":27,"state":"North Carolina","grid":"SERC","program":"REPS (2007)","target":"12.5% by 2021 (investor-owned)","target_year":2021,"base2024":"12%","oblig2026":"12%","tiers":"Renewable/Swine Waste","techs":"Solar,Wind,Swine Waste,Poultry Waste","acp":"$12","note":""},{"country":"US","num":28,"state":"Texas","grid":"ERCOT","program":"SB 7 (1999)","target":"10,000 MW (met); voluntary REC","target_year":null,"base2024":"30%","oblig2026":"32%","tiers":"ERCOT RECs","techs":"Wind,Solar,Geo,Biomass,Hydro","acp":"$0-$2","note":""},{"country":"US","num":29,"state":"Iowa","grid":"MISO/SPP","program":"SF 367 (1983)","target":"105 MW mandate (met)","target_year":1990,"base2024":"60%","oblig2026":"60%","tiers":"Wind (historical)","techs":"Wind","acp":"$0","note":""},{"country":"US","num":30,"state":"Wisconsin","grid":"MISO","program":"Act 141","target":"10% by 2015 (met)","target_year":2015,"base2024":"12%","oblig2026":"12%","tiers":"Renewable","techs":"Wind,Solar,Biomass","acp":"$10","note":""},{"country":"US","num":31,"state":"Missouri","grid":"MISO/SPP","program":"Prop C (2008)","target":"15% by 2021 (met)","target_year":2021,"base2024":"10%","oblig2026":"11%","tiers":"Renewable","techs":"Solar,Wind,Small Hydro,Biomass","acp":"$50","note":""},{"country":"US","num":32,"state":"Hawaii","grid":"HECO","program":"HRS 269-92","target":"100% by 2045","target_year":2045,"base2024":"38%","oblig2026":"45%","tiers":"Tier 1","techs":"Solar,Wind,Geo,OTEC,Biomass","acp":"$50","note":""},{"country":"US","num":33,"state":"DC","grid":"PJM","program":"RPS (DC)","target":"100% by 2032","target_year":2032,"base2024":"0%","oblig2026":"59%","tiers":"Tier 1/Solar Carve-out","techs":"Solar,Wind,Fuel Cell","acp":"$400 SREC","note":"VERIFIED: 2026 Tier 1 requirement 59% (DC Code 34-1432, ramps to 100% by 2032); in-District generation ~nil, met via PJM RECs"},{"country":"CAN","num":34,"state":"British Columbia","grid":"AESO/WECC","program":"Clean Energy Act (2024 update)","target":"100% clean by 2030 (integrated grid)","target_year":2030,"base2024":"98%","oblig2026":"99%","tiers":"Clean/Non-emitting","techs":"Hydro,Wind,Solar,Geo,Tidal","acp":"N/A","note":"VERIFIED: Clean Energy Act statutory base 93% (surpassed, ~98%); 100%/2030 is the 2024 objective"},{"country":"CAN","num":35,"state":"Alberta","grid":"AESO","program":"Renewable Electricity Act (2020)","target":"30% RE by 2030 (legislated target)","target_year":2030,"base2024":"26%","oblig2026":"28%","tiers":"Legislated target; REP procurement ended 2019","techs":"Wind,Solar,Geo","acp":"n/a (no compliance market)","note":"~26% renewable 2023 via private PPAs. Renewable Electricity Act target is legislated but the REP procurement mechanism was cancelled in 2019, and a 2023-24 approvals moratorium plus siting rules stalled projects. No RPS compliance obligation or ACP."},{"country":"CAN","num":36,"state":"Ontario","grid":"IESO","program":"LT2 Procurement (2024)","target":"Up to 14 TWh new RE by 2030","target_year":2030,"base2024":"35%","oblig2026":"38%","tiers":"IESO-procured","techs":"Wind,Solar,Hydro,Nuclear,Storage","acp":"N/A","note":"VERIFIED: IESO LT2 targets up to 14 TWh new energy (in-service 2030-34), not 55 TWh; Ontario procures, no RPS obligation"},{"country":"CAN","num":37,"state":"Quebec","grid":"HQ","program":"Loi sur Hydro-Quebec","target":"100%+ hydro; +8 TWh wind","target_year":2035,"base2024":"99%","oblig2026":"99%","tiers":"Hydro/Wind","techs":"Hydro,Wind","acp":"N/A","note":""},{"country":"CAN","num":38,"state":"Manitoba","grid":"Manitoba Hydro","program":"Clean Energy Mandate","target":"97%+ clean","target_year":2030,"base2024":"97%","oblig2026":"97%","tiers":"Non-emitting","techs":"Hydro,Wind","acp":"N/A","note":""},{"country":"CAN","num":39,"state":"Saskatchewan","grid":"SaskPower","program":"Integrated Resource Plan (2023)","target":"50% RE by 2030","target_year":2030,"base2024":"22%","oblig2026":"26%","tiers":"Renewable","techs":"Wind,Solar,Geo,Small Hydro","acp":"C$40","note":""},{"country":"CAN","num":40,"state":"Nova Scotia","grid":"NSUARB","program":"Renewable Electricity Plan","target":"80% by 2030","target_year":2030,"base2024":"43%","oblig2026":"54%","tiers":"Tier 1/Tier 2","techs":"Wind,Solar,Biomass,Tidal","acp":"C$30","note":""},{"country":"CAN","num":41,"state":"New Brunswick","grid":"NBSO","program":"Electricity from Renewable Resources Reg.","target":"40% renewable (met 2019; ~44% now)","target_year":2020,"base2024":"44%","oblig2026":"44%","tiers":"Renewable","techs":"Wind,Small Hydro,Solar","acp":"C$20","note":"VERIFIED: 40% RPS met by 2020 (surpassed 2019); now ~44% renewable, no newer statutory target"},{"country":"CAN","num":42,"state":"Prince Edward Island","grid":"Maritimes/NB grid","program":"Renewable Energy Act","target":"100% by 2035","target_year":2035,"base2024":"100%","oblig2026":"100%","tiers":"Wind (primary)","techs":"Wind,Solar,Biomass","acp":"N/A","note":""},{"country":"CAN","num":43,"state":"Newfoundland & Labrador","grid":"NL Power","program":"Muskrat Falls + Wind","target":"94%+ clean","target_year":2030,"base2024":"94%","oblig2026":"95%","tiers":"Hydro/Wind","techs":"Hydro,Wind","acp":"N/A","note":""}],"load_anchors":{"WECC":[728,788,835,875,915,967],"MISO":[945,960,972,982,989,1000],"PJM/SPP":[855,873,890,904,917,934],"NPCC":[288,293,302,307,313,323],"SERC/ERCOT":[1282,1326,1366,1400,1431,1470],"Canada":[581,605,630,653,676,707]},"oblig_anchors":{"US Total":[600,780,1050,1320,1560,1820],"Canada Total":[400,440,490,540,590,640]},"sd_anchors":{"WECC Supply":[405,515,635,751,861,990],"WECC Demand":[330,380,430,470,505,545],"MISO Supply":[224,288,364,440,510,591],"MISO Demand":[200,240,290,340,390,450],"PJM Supply":[145,225,338,477,619,775],"PJM Demand":[220,270,320,370,420,480],"NPCC Supply":[330,388,463,544,631,731],"NPCC Demand":[130,155,185,215,245,285]},"rec_price_anchors":{"DC SREC":[400,340,250,160,100,60],"MA SREC-II":[315,230,140,70,35,18],"NJ SREC":[215,150,85,40,20,10],"MD SREC":[55,62,52,38,26,18],"VA SREC":[45,44,36,28,20,14],"PA SREC":[40,42,34,25,19,14],"PJM Tier 1":[39,42,33,24,18,14],"MA Class I":[30,42,50,40,28,18],"NY Class I":[18,28,38,30,20,12],"CA PCC1":[9.5,19.0,21.0,17.0,13.0,11.0],"CA PCC3":[3.5,5.0,5.5,4.5,3.0,1.75]},"buildout_anchors":{"Solar (WECC+MISO+PJM)":[13,21,28,32,34,33],"Wind (all)":[14,18,22,25,26,25],"Offshore Wind":[0.5,3.5,12,20,26,28],"BESS":[7,14,22,28,32,30]},"cost_anchors":{"California":[0.9,1.6,3.8,5.2,5.8,5.5],"New York":[0.6,1.2,2.8,4.1,4.8,4.5],"MISO States":[0.4,0.8,1.8,2.8,3.5,3.8],"PJM States":[0.8,1.5,3.0,4.5,5.5,5.0],"NE States":[0.5,0.9,2.0,3.0,3.5,3.2],"Canada":[0.9,1.3,2.2,3.5,4.8,5.5]},"na_anchors":{"NA REC Supply":[1282,1646,2085,2550,3009,3532],"NA RPS Obligation":[1000,1220,1540,1860,2150,2460]},"eligibility":{"supply_sources":["CA Solar","NV Solar","OR Wind","WA Wind","MT Wind","TX Wind","IA Wind","MN Wind","QC Hydro","BC Hydro","NS/NB Wind","NY Wind","NE Wind","ON Wind","NJ Offshore","VA Offshore"],"demand_states":["CA","NY","IL","MI","MN","CO","WA","OR","MA","CT","RI","MD","NJ","VA","TX","AB"],"matrix":{"CA Solar":{"CA":"Y","NY":"N","IL":"Y","MI":"N","MN":"N","CO":"Y","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"NV Solar":{"CA":"Y","NY":"N","IL":"Y","MI":"N","MN":"N","CO":"Y","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"OR Wind":{"CA":"Y","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"Y","OR":"Y","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"WA Wind":{"CA":"Y","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"Y","OR":"Y","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"MT Wind":{"CA":"P","NY":"N","IL":"N","MI":"N","MN":"Y","CO":"Y","WA":"Y","OR":"Y","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"TX Wind":{"CA":"N","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"IA Wind":{"CA":"N","NY":"N","IL":"Y","MI":"Y","MN":"Y","CO":"N","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"MN Wind":{"CA":"N","NY":"N","IL":"Y","MI":"Y","MN":"Y","CO":"N","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"QC Hydro":{"CA":"N","NY":"P","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"II","CT":"II","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"BC Hydro":{"CA":"P","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"Y","OR":"Y","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"NS/NB Wind":{"CA":"N","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"Y","CT":"Y","RI":"Y","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"NY Wind":{"CA":"N","NY":"Y","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"Y","CT":"Y","RI":"Y","MD":"N","NJ":"Y","VA":"N","TX":"-","AB":"N"},"NE Wind":{"CA":"N","NY":"Y","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"Y","CT":"Y","RI":"Y","MD":"N","NJ":"Y","VA":"N","TX":"-","AB":"N"},"ON Wind":{"CA":"N","NY":"P","IL":"N","MI":"P","MN":"N","CO":"N","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"N","NJ":"N","VA":"N","TX":"-","AB":"N"},"NJ Offshore":{"CA":"N","NY":"Y","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"Y","CT":"Y","RI":"Y","MD":"Y","NJ":"Y","VA":"N","TX":"-","AB":"N"},"VA Offshore":{"CA":"N","NY":"N","IL":"N","MI":"N","MN":"N","CO":"N","WA":"N","OR":"N","MA":"N","CT":"N","RI":"N","MD":"Y","NJ":"Y","VA":"Y","TX":"-","AB":"N"}},"legend":{"Y":"Eligible","II":"Class II only","P":"Partial / conditional","N":"Not eligible","-":"N/A (voluntary)"}},"stats":[{"label":"Jurisdictions","value":"43","sub":"33 US (incl. DC) + 10 Canadian provinces"},{"label":"Interconnections","value":"7+","sub":"WECC, MISO, PJM, NPCC, SERC, ERCOT, Canada"},{"label":"2026 RPS demand (US)","value":"~1,080 TWh","sub":"Across all active programs"},{"label":"2045 target supply","value":"3,532 TWh","sub":"NA renewables (base case)"},{"label":"2026 avg CA PCC1","value":"$10.95/MWh","sub":"Nodal Exchange, Feb 2026"},{"label":"NJ SREC 2026","value":"$85/MWh","sub":"Flett Exchange, Jan 2026"},{"label":"2030 NA build","value":"64 GW/yr","sub":"Solar + Wind + BESS additions"}]}